Solar power plants for businesses Electricity as a cost you control.

Plants for halls, hotels, shops, offices and farms, sized to your consumption — without oversizing. A clear payback, IRR and lower operating costs from the first month of operation.

  • Payback and IRR included
  • Peak demand analysis
  • Design and grid procedure

In short: Brant Energy (Trogir) designs and builds turnkey solar plants for businesses, hotels, shops and farms across Croatia — from consumption analysis and a feasibility study to the grid procedure and commissioning. For a business using about 120,000 kWh a year this is typically a plant of about 68 kWp, an investment of about €49,000 excl. VAT and a payback of about 5 years. An engineer replies within 24 hours.

Lower OPEX

Power produced on your own roof carries no market swings or network fees for that part of your consumption.

No oversizing

We match the plant to consumption, because surplus sent to the grid is worth far less than power you use yourself.

ESG reporting

Lower CO₂ emissions and a measurable share of renewable energy — data that customers, banks and partners ask for.

Discreet handling

One contact person, clear deadlines and documentation prepared for your accounting.

Business calculator

How much could your business save?

Enter your activity, annual consumption and available area. You get a recommended size without oversizing, the investment, annual savings, payback and IRR.

Example estimates

What the calculator says for typical businesses.

Indicative results from our business calculator for a site in Split-Dalmatia County, excl. VAT. Your result depends on consumption, roof and how much power you use during the day.

Manufacturing hall

About 120,000 kWh a year

Plant67.9 kWp
Savings€10,190
Investment
about €49,000
Payback
about 5 years
IRR (25 yrs)
about 22 %
Payback with full HBOR rebate
about 2 years
Hotel / apartments

About 80,000 kWh a year

Plant47.9 kWp
Savings€6,810
Investment
about €35,900
Payback
about 5 years
IRR (25 yrs)
about 20 %
Payback with full HBOR rebate
about 3 years
Farm / winery

About 30,000 kWh a year

Plant15.8 kWp
Savings€2,500
Investment
about €13,900
Payback
about 5 years
IRR (25 yrs)
about 19 %
Payback with 65 % grant
about 2 years

Savings shown per year. Investment excl. VAT (reverse charge). Rebate and grant depend on HBOR and Modernisation Fund terms and are shown for illustration.

Plant size for businesses

Solar plants from 30 to 500 kW: which size for which consumption.

Indicative figures for a south-facing roof in Split-Dalmatia County, with panels of about 465 W. We always choose the size from your actual consumption, without oversizing.

Plant sizeIndicative investment (excl. VAT)PanelsRoof areaAnnual productionFor annual consumption of aboutIndicative annual savingsYour building
30 kWabout €23,40065about 145 m²about 43,800 kWh56,000 kWhabout €4,800Study →
40 kWabout €31,00086about 190 m²about 58,000 kWh74,000 kWhabout €6,300Study →
50 kWabout €37,200108about 240 m²about 72,800 kWh93,000 kWhabout €7,900Study →
70 kWabout €50,600151about 330 m²about 101,800 kWh130,000 kWhabout €11,100Study →
80 kWabout €57,700172about 380 m²about 116,000 kWh148,000 kWhabout €12,600Study →
90 kWabout €65,000194about 430 m²about 130,800 kWh167,000 kWhabout €14,300Study →
100 kWabout €72,100215about 475 m²about 145,000 kWh185,000 kWhabout €15,800Study →
500 kWon request, based on a study1,075about 2,370 m²about 725,000 kWh925,000 kWhabout €79,000Enquiry →

Savings assume the business uses about a third of the electricity produced directly during the day and exports the rest to the grid. The investment is indicative, excluding VAT (reverse charge) and without grants. A flat roof with an east–west layout produces about 10 % less. The business solar estimate shows the investment and payback for your building.

30 kW, 40 kW and 50 kW solar plants

The most common choice for farms, wineries, smaller hotels, shops and office buildings using about 50,000 to 90,000 kWh a year. They need about 145 to 240 m² of roof; we check the roof’s load capacity before the offer.

70 kW, 80 kW, 90 kW and 100 kW solar plants

For production sites, cold stores, larger hotels and retail buildings using about 130,000 to 190,000 kWh a year. They need about 330 to 475 m² of roof, most often the metal roof of a hall.

500 kW solar plants

For large production sites, logistics centres and halls with about 2,400 m² of roof, or for a ground-mounted plant. At this size we determine the capacity and feasibility from your metering data (load profile), and the grid connection procedure is more extensive. Contact us for a feasibility study — the online calculator covers plants up to 150 kWp.

Peak demand savings

One peak can set the cost for the whole month.

Businesses on Croatia's red low-voltage tariff and customers connected at medium voltage pay not only for energy but also for billed peak active power — the highest 15-minute average load in the month. It takes just one moment when compressors, ovens or air conditioning start together, and that peak sets the demand charge for the whole billing period.

A solar plant reduces the load drawn from the grid while it produces, softening daytime peaks — especially in summer, when air conditioning runs hardest. More reliable results come from combining the plant with a battery and load management: the battery discharges exactly at peak moments, and the system delays or staggers the start of large loads.

We estimate what this is worth for your site from 15-minute metering data and include it with the offer.

Sectors

For every consumption pattern.

The best payback goes to sites that use most of their power during the day — when the plant produces.

Manufacturing and halls

Machines, compressors and cooling run during the day, so much of the output is used directly on site.

Hotels and tourism

Summer air conditioning and hot water coincide with peak production. Guests increasingly expect an EV charger too.

Retail and warehouses

Lighting and display fridges run all day, and flat roofs are ideal for a plant.

Farms and agriculture

Irrigation, cold storage and dryers — with the option of a hybrid system for remote plots.

Offices and services

IT and air conditioning during working hours — predictable consumption and a simple calculation.

Company vehicles

Fleet chargers alongside the plant: vehicles charge on your own energy, with per-vehicle monitoring.

Process

From metering data to permanent operation.

A business project starts with numbers, not a sales pitch.

  • Consumption analysis

    15-minute load curves and bills for the last 12 months.

  • Feasibility study

    Optimal size, investment, cash flow, payback and IRR.

  • Design and approvals

    Main design, roof structural check and the full grid procedure.

  • Installation

    Mounting planned around your operations, testing and a trial run.

  • Production monitoring

    Remote monitoring of the plant and data for ESG reports.

Warranties

An investment protected for decades.

25yrs

Panel warranty

Manufacturer's product warranty.

30yrs

Output warranty

Guaranteed panel output power.

10yrs

Inverter warranty

Inverter manufacturer's warranty.

2yrs

Workmanship warranty

On Brant Energy's mounting and electrical work.

FAQ

Questions from businesses.

How quickly does a plant pay off for a business?

It depends on consumption, electricity prices and how much of the produced energy you use during the day. The calculator gives an estimated payback and IRR, and the feasibility study is based on your actual metering data.

Why don't you recommend the largest possible plant?

Surplus power fed into the grid is worth far less than power you use yourself. That is why we size the plant to your consumption — it gives the shortest payback and the smallest investment.

How is VAT handled on business projects?

Reverse-charge VAT applies to construction work between VAT-registered businesses in Croatia. Prices in the business calculator are shown excluding VAT.

Can a solar plant reduce peak demand charges?

Yes, if peaks coincide with production; with a battery and load management the effect is larger and more reliable. We estimate it from 15-minute metering data.

Do you build larger plants?

The calculator covers plants up to about 150 kWp. For larger projects we prepare an individual study and design.

Feasibility study

Send us your consumption. We send the numbers.

The study comes with no obligation. An engineer replies within 24 hours.

Estimate WhatsApp E-mail