Design and grid procedure
Main design signed by a licensed engineer and the full procedure with the distribution operator.
The city that officially greets the sun: from houses in Zadar and Ravni kotari to rentals on Ugljan and Pašman, we build plants that withstand even the strongest bora.
Zadar is known for the Greeting to the Sun, a circle of glass plates with photovoltaic modules on the waterfront that collects solar energy by day and turns it into a light show at night. The same sun can cut your bills too: the Zadar area has a long run of sunny days, and many houses and rentals have roofs well suited to a plant.
A special feature here is the bora wind from Velebit, which can be extremely strong. We size the mounting structure to the actual wind load for the site, leave roof edge zones free where needed and tighten every joint with a torque wrench. Zadar’s Venetian defence works are UNESCO heritage, so for buildings in the protected core we check conservation requirements.
On the Zadar islands and in the hinterland, many properties have no permanent connection or limited connection capacity. For them we propose hybrid or off-grid systems with a battery, and for rentals a plant with a guest EV charger.
In the Zadar area, grid connection is handled by HEP ODS, Elektra Zadar. We prepare the application, main design and technical documents, follow the consent and arrange the meter. Ravni kotari has many family houses with large roofs and farm buildings, where a plant can go on an outbuilding. For new builds we suggest planning cable routes and the distribution board early.
The county is already selected. For a more precise estimate, mark your roof on the aerial image in step two.
Main design signed by a licensed engineer and the full procedure with the distribution operator.
Installation to the design and manufacturer’s instructions, mounts tightened with a torque wrench.
We prepare the documents for the Fund’s public call; households pay 0 % VAT.
Trial run, testing, a monitoring app and support after installation.
Yes, if the structure and fixings are sized for the wind load at the site. That is part of our design, and we install with a torque wrench to the specified force.
Yes. We plan equipment transport and installation in advance so the work is done in one trip.
We propose a plant matched to the connection or a hybrid system with a battery. If more capacity is needed, we handle the procedure with the distribution operator.
Ideally during construction. Cable conduits, space for the inverter and battery and charger preparation are easy to plan then, and the plant goes on once the roof is done.
An engineer replies within 24 hours with a proposal for your roof.