Design and grid procedure
Main design signed by a licensed engineer and the full procedure with the distribution operator.
From Brela and Baška Voda to Tučepi, Podgora and Gradac: tourist properties on the Riviera use the most power in summer — exactly when the sun delivers the most.
The Makarska Riviera lives from tourism, and air conditioning, pools and hot water make up most of the summer electricity bill. A plant on the roof of a rental or small hotel produces the most in the season, so much of the energy is used directly, without buying from the grid. An EV charger is also increasingly decisive for guests choosing accommodation.
The Biokovo massif closes the Riviera to the east. In parts of the towns the morning sun arrives later, especially in winter, which affects east-facing roof surfaces. When you mark your roof on the aerial image in our calculator, the estimate uses your exact location and local horizon, and before the offer we also check shading through the year.
For hotels and larger rental properties we prepare a business calculation with payback and IRR and check peak demand charges. Installation is planned off-season or at times that do not disturb guests.
On the Makarska Riviera, grid connection is handled by HEP ODS, Elektrodalmacija Split. For tourist properties we check the existing connection capacity, as rentals with many air conditioners often run close to the limit. The plant reduces grid load in the hottest hours, and with a battery and load control a costly capacity increase can often be avoided.
The county is already selected. For a more precise estimate, mark your roof on the aerial image in step two.
Main design signed by a licensed engineer and the full procedure with the distribution operator.
Installation to the design and manufacturer’s instructions, mounts tightened with a torque wrench.
We prepare the documents for the Fund’s public call; households pay 0 % VAT.
Trial run, testing, a monitoring app and support after installation.
Usually yes, because the biggest load — air conditioning in season — coincides with peak production. The calculator shows an approximate payback for your bill.
At some locations the morning sun arrives later, especially in winter. That is why we use data for the exact location and check the horizon before the offer.
Yes, and we recommend it. We plan the work so the plant is running before the next season.
A plant reduces grid load while the sun shines, and a battery with load control can soften peaks. Before proposing anything we check the connection and the distribution board.
An engineer replies within 24 hours with a proposal for your roof.