Design and grid procedure
Main design signed by a licensed engineer and the full procedure with the distribution operator.
From family houses in Žnjan and Mertojak to apartment buildings and commercial premises — in Split we design plants that match real consumption, without oversizing.
Split has plenty of sunny days and high summer consumption, but also a specific challenge: many residents live in apartment buildings. Croatian law now allows co-owners to build a shared rooftop plant and split the energy as a group of active customers; according to available guidance, consent from co-owners holding more than half the building’s area is sufficient, and those who invest take part. At the end of 2025 Split’s first high-rise with a rooftop solar plant was connected to the grid.
Family houses in city neighbourhoods often face space limits: smaller roofs, chimneys and neighbouring buildings casting shade. That is why our calculator lets you mark your roof on aerial imagery, and before the offer we check shading through the year and propose a panel layout that gets the most energy from the available area.
For buildings inside the protected historic core — Diocletian’s Palace has been a UNESCO site since 1979 — installation requires conservation approval. For commercial premises and halls in Split we also prepare feasibility studies, including peak demand savings.
In Split, grid connection is handled by HEP ODS, Elektrodalmacija Split. For houses we prepare the application and design and follow the procedure to permanent operation; for buildings we also help with the documents a shared plant needs: co-owners’ consent, an energy-sharing agreement and metering point data. On city plots we check roof access, the place for the distribution board and the cable route in advance.
We build turnkey solar plants in every Split neighbourhood — from Stobreč, Žnjan and Mertojak to Visoka, Pujanke, Kamen, Mejaši and Žrnovnica — and in the surrounding area: Solin, Klis, Podstrana and Kaštela. Split has more than 2,600 hours of sunshine a year, so the same plant produces noticeably more electricity here than in continental Croatia.
Installation is carried out by certified installers with many years of experience, and we check every connection before commissioning. We choose mounts and fixings for the local wind load, as bura gusts in Split can exceed 100 km/h, and near the sea we pay particular attention to protecting mounts and connections from corrosion.
Homes with a bill of about €100 to €250 a month usually need a plant of about 5 to 11 kW. The solar estimate shows exactly what your roof needs in a few steps, and the home page explains what a turnkey solar plant includes — from design and the procedure with HEP ODS to commissioning.
Indicative figures for a house with a south-facing roof in Split and the surrounding area. The estimate below shows the exact price for your roof.
| Plant size | Indicative price (0 % VAT) | With subsidy | Panels | Annual production in Split | For a monthly bill of about | Indicative annual savings | Your roof |
|---|---|---|---|---|---|---|---|
| 5 kW | about €5,400 | about €2,700 | 11 | about 7,400 kWh | €115 | about €760 | Estimate → |
| 8 kW | about €7,360 | about €3,680 | 17 | about 11,500 kWh | €175 | about €1,170 | Estimate → |
| 10 kW | about €8,780 | about €4,390 | 22 | about 14,800 kWh | €225 | about €1,510 | Estimate → |
| 12 kW | about €10,860 | about €5,430 | 26 | about 17,500 kWh | €270 | about €1,790 | Estimate → |
| 15 kW | about €13,080 | about €7,080 | 32 | about 21,600 kWh | €330 | about €2,200 | Estimate → |
Prices are indicative, turnkey at 0 % VAT, and not an offer. The Fund's subsidy covers up to 50 %, but no more than €600 per kW and €6,000 per plant, and depends on the open public call. For every size from 4 to 20 kW see the home solar price table, and for businesses plants from 30 to 500 kW.
The county is already selected. For a more precise estimate, mark your roof on the aerial image in step two.
Main design signed by a licensed engineer and the full procedure with the distribution operator.
Installation to the design and manufacturer’s instructions, mounts tightened with a torque wrench.
We prepare the documents for the Fund’s public call; households pay 0 % VAT.
Trial run, testing, a monitoring app and support after installation.
Yes. Co-owners can act as a group of active customers and share the energy by an agreed key. We help with the design, documents and the procedure with the grid operator.
Sometimes it does, with a careful panel layout and equipment suited to partial shade. Mark your roof on the aerial image in the calculator and we will assess payback before any commitment.
Yes. For businesses we calculate payback and IRR and size the plant to actual daytime consumption.
It depends on the distribution operator’s deadlines and on whether more connection capacity is needed. Design and installation are quick, and we handle the whole procedure for you with regular updates.
An engineer replies within 24 hours with a proposal for your roof.