Design and grid procedure
Main design signed by a licensed engineer and the full procedure with the distribution operator.
Hvar is known as one of the sunniest islands in the Adriatic. From rentals in Hvar and Jelsa to wineries and farms on the Stari Grad Plain — that sun can work for you.
Few places in Croatia get as many hours of sunshine as Hvar, and the island’s power use peaks in summer, when rentals are full and air conditioning runs day and night. In that season a rooftop plant covers much of the demand directly, and a battery shifts daytime surplus into the evening, when guests are in their rooms.
The Stari Grad Plain, one of the best-preserved ancient field systems in the Mediterranean, has been a UNESCO World Heritage Site since 2008. In the fields and on village edges there are many farm buildings, wineries and cottages without a grid connection — for them we design off-grid systems for irrigation, cold storage and lighting, sized with a reserve for cloudy days.
For properties in protected zones and historic centres we check conservation requirements before the offer. We plan installation outside the tourist season and arrange ferry transport of the equipment in advance.
On Hvar, grid connection is handled by HEP ODS, Elektrodalmacija Split; we prepare the application, design and documents and follow the procedure to permanent operation. Because island lines are long, the grid has limited capacity in places, so we match plant size to the operator’s conditions.
The county is already selected. For a more precise estimate, mark your roof on the aerial image in step two.
Main design signed by a licensed engineer and the full procedure with the distribution operator.
Installation to the design and manufacturer’s instructions, mounts tightened with a torque wrench.
We prepare the documents for the Fund’s public call; households pay 0 % VAT.
Trial run, testing, a monitoring app and support after installation.
For rentals with high evening use, a battery can cover evenings and nights with your own energy. The calculator shows both options — panels only and with a battery.
Yes, with an inverter chosen for the pump’s start-up current. The off-grid calculator estimates the system size for the selected appliances.
Yes, across the whole island. We plan the work to be finished in one trip.
For wineries with cooling and processing, consumption peaks in summer and harvest, when production is high. The business calculator gives an approximate payback, and we prepare a detailed study from metering data.
An engineer replies within 24 hours with a proposal for your roof.