Electrical installations and distribution boards Wiring that can handle tomorrow's demand.

Solar, an EV charger, a heat pump and air conditioning load your wiring like never before. We install and renovate electrical installations, distribution boards and protection — with testing and documentation.

What we do

From the connection to the last socket.

Experience in supervising electrical installations means we know what inspectors and the grid operator look for — and where mistakes are most common.

New installations

Power and low-voltage installations for houses, apartments and commercial premises, according to design.

Renovations

Replacing outdated wiring and adapting the building to higher demand, with minimal wall chasing.

Distribution boards

New boards and extensions of existing ones, with clearly labelled circuits.

DC and AC protection

Surge protection, residual current devices and fuses for solar plants and chargers.

Testing and certificates

Required electrical measurements, tests and documentation for connection and inspection.

Future-ready wiring

Wiring prepared for solar, an EV charger and a heat pump — before you need them.

Measuring voltage in a distribution board
3 yearsof experience supervising electrical installations
Building or renovating?

The cheapest wiring is wiring done on time.

Running cables for a charger or solar plant afterwards means chasing walls, dust and extra cost. If you are building or renovating, we prepare cable routes, conduits and space in the board for everything you plan for the next ten years.

  • Conduits and a route from the roof to the board for a future plant
  • Correctly sized cable to the garage or parking space
  • Reserved space in the board for plant and charger protection
Electrical enquiry

Describe the property; we propose a solution.

Send a short description of the work or the design. An engineer replies within 24 hours.

Do you do electrical installations for new builds?

Yes. It is best to involve us at the design stage so the wiring is ready for a solar plant, an EV charger and a heat pump from day one.

Do I need a new distribution board for a solar plant?

Not always. By inspecting the existing board we assess whether there is room for the plant's protection or whether an extension or a new board is needed.

Do I get a certificate after the work?

Yes. After completion we carry out the required measurements and issue the documentation needed for connection and technical inspection.

How far in advance should I book?

The earlier the better — especially for new builds. Send us the design or a description of the property and we will propose a date.

  • An engineer replies within 24 hours on working days.
Estimate WhatsApp E-mail