Design and grid procedure
Main design signed by a licensed engineer and the full procedure with the distribution operator.
From houses and rentals on the coast to cottages and farms in the hinterland towards Drniš and Knin — for the Šibenik area we design grid-tied, hybrid and off-grid systems.
Šibenik-Knin County combines two worlds: a coast with holiday rentals and second homes, and a wide hinterland with family farms, olive groves and cottages, some without a grid connection. That is why we build all three system types here — from a standard grid-tied plant to a fully independent off-grid system with a battery.
Šibenik has two UNESCO World Heritage monuments — the Cathedral of St James and St Nicholas Fortress. In protected zones, panels need conservation approval, which we check before the offer. For islands and remote villages we plan installation logistics in advance so the work is done in one trip.
For properties without a grid connection we size the system for winter sun, with a reserve for sunless days and a backup generator if needed. For connected houses we size the plant to consumption, with the option of a battery for evenings and nights.
In the Šibenik area, grid connection is handled by HEP ODS, Elektra Šibenik. For connected properties we prepare the application, design and documents to permanent operation; off-grid sites need no connection, so the procedure is simpler. The Fund’s household subsidy covers only grid-connected plants, so we show both options and their costs before you decide.
The county is already selected. For a more precise estimate, mark your roof on the aerial image in step two.
Main design signed by a licensed engineer and the full procedure with the distribution operator.
Installation to the design and manufacturer’s instructions, mounts tightened with a torque wrench.
We prepare the documents for the Fund’s public call; households pay 0 % VAT.
Trial run, testing, a monitoring app and support after installation.
An off-grid system with panels and a battery can run lighting, a fridge, a pump and smaller appliances without a grid connection. The off-grid calculator gives an approximate size and price.
Yes. We plan island installations in advance, including transporting equipment, so the work is finished in one trip.
We do — from the application to the distribution operator to permanent operation and the bidirectional meter.
The Fund’s household call covers grid-connected plants, so an off-grid system usually does not qualify. Households still pay 0 % VAT if it is installed on a residential building.
An engineer replies within 24 hours with a proposal for your roof.