Design and grid procedure
Main design signed by a licensed engineer and the full procedure with the distribution operator.
From Supetar, Bol and Milna to the inland villages: on Dalmatia’s largest island we build plants for houses and rentals, and stand-alone systems for cottages in olive groves.
Brač is the largest island in Dalmatia, with many stone houses, rentals and cottages in olive groves and vineyards far from the grid. That is why we build two kinds of systems here: grid-tied plants for homes and tourist properties, and off-grid systems with a battery for unconnected sites, where the sun replaces a noisy generator.
Stone houses and roofs of stone slabs or clay tiles need careful installation. We fix mounts without damaging the roof covering and adapt the installation to the type and condition of the roof covering. Where a roof is unsuitable, we propose an outbuilding or a ground-mounted array next to the house, if the spatial plan and building rules allow it.
We plan island installations in detail — ferry transport, site access and the order of work — so everything is done in one trip. The grid procedure and subsidy application work the same as on the mainland.
On Brač, grid connection for connected plants is handled by HEP ODS, Elektrodalmacija Split, as on the mainland, and we manage the whole procedure. The island grid sometimes has limited capacity at line ends, so we propose a size the grid can accept and route surplus to a battery or water heater if needed.
The county is already selected. For a more precise estimate, mark your roof on the aerial image in step two.
Main design signed by a licensed engineer and the full procedure with the distribution operator.
Installation to the design and manufacturer’s instructions, mounts tightened with a torque wrench.
We prepare the documents for the Fund’s public call; households pay 0 % VAT.
Trial run, testing, a monitoring app and support after installation.
For lighting, a fridge, a pump and occasional tools — yes. For larger loads the generator stays as a backup that starts only when the battery runs low.
Yes, with adapted fixings that do not damage the covering. Before the offer we assess the roof condition and load capacity.
The work itself usually takes a few days. We plan transport and access in advance so no extra trips are needed.
It does, especially if the house or rental is full and uses air conditioning then. Off-season the plant keeps working, and energy sent to the grid reduces your bill in the months you are away.
An engineer replies within 24 hours with a proposal for your roof.